Paysheet #10514

Job Created: 08/13/25
Job Number: CP2502 Job Name: V-2727 PKG 54 - 105206053
Job Notes: 1145/1147 Patterson Crew dug up existing 4” yellow main and 1” to 1 1/4 service crew retired old tee along with old stab riser and curb valve crew installed new 4x1 riser 1100 efv due to double meter and 2 90s to tie into existing 1 1/4 yellow pl crew installed new riser and curb valve fused tested gassed up. Plumbers cut in a reg installed 1 new meter other was already new tested hl did relight at 1145 but not 1147 crew was directed to leave second meter active since appliances were off
SAP Workorder Number: 117304031
 
Foreman Name:Tyler
Work Dates: 08/13/25 - 08/13/25
Item - Description Item Qty Item UOM
3013439 - Svc: Service Riser Replacement 1 EA
3013506 - Svc: Fabricate In-line Two Bar Meter Set 1 EA
3013525 - T & M: Three-Person Construction Crew, Straight Time 2 HR
3013608 - Svc: Relight Customer Appliances 1 EA
3013789 - SERVICES: REPLACE SERVICE T AND INSTALL EFV IN HARD SURFACE 1 EA
3013673 - Combo Dig/Backfill: Remove sidewalk (including disposal) 25 SF
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 10 FT
Extra Service Items:


THIS ORDER IS: APPROVED