Job Created: 07/23/22
Job Number: VEC2226 Job Name: V-2418
Job Notes: Removed steel plates from road crossings on Huffman Ave and cold patched over the cdf flow fill. Backfilled bell holes on the corners. Saw cut and removed sidewalk blocks on Linden Ave and open cut ditch for pipe install. Installed new 4” pipe and wire. Backfilled ditch line.
SAP Workorder Number: 98784413
 
Foreman Name:Anthony Delawder
Work Dates: 07/22/22 - 07/22/22
Item - Description Item Qty Item UOM
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 40 FT
3013673 - Combo Dig/Backfill: Remove sidewalk (including disposal) 500 SF
3013907 - Install 3" & 4" - >2000' by trench 80 FT
3013409 - Combo Dig/Backfill: Provide & place asphalt cold patch 7.53 TON
3013407 - Combo Dig/Backfill: Provide & place sand fill 88.69 TON
3013408 - Combo Dig/Backfill: Provide & place gravel fill 64.56 TON
Extra Service Items:


THIS ORDER IS: APPROVED