Paysheet #1571

Job Created: 07/29/22
Job Number: VEC22133 Job Name: 101955528
Job Notes: 1071 Yellowstone rd. Started job on Monday, 7/25 had my 4 hrs of investigation to find leak dug up and confirmed where and what to do, couldn’t get material till 3pm so pushed back till Thursday to finish job. Cut hole to CL of road and 8’ off, found 2” and opened up everything main had 3 leak bands on it, was told to cut out everything and replace section, plated till Thursday, came back and welded 3 shortstops on and stoppled main to weld 2 transition fitting and replaced 8’ of 2” plastic. Pre-tested 2” plastic pipe outside of hole, cut 8’ and set in. Welded anoide on, wrapped pipe, and had 9yrds of flow fill, backfilled and plated hole.
SAP Workorder Number: 101955528
 
Foreman Name:John Greene
Work Dates: 07/25/22 - 07/28/22
Item - Description Item Qty Item UOM
3013479 - 2" HALF ENCIRCLEMENT WELD FITTING 1 EA
3013466 - 2" STEEL TO PLASTIC TIE-IN, FULL ENCIRCLEMENT WELD FITTING 2 EA
3014620 - Combo Dig/Backfill: Extra depth-bell hole (5-10') 60 SQFT/FT
3013407 - Combo Dig/Backfill: Provide & place sand fill 6.63 TON
3013671 - PROVIDE & PLACE FLOWABLE FILL, 3 - 10 CUYD 9 CY
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 60 SF
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 38 FT
3013741 - T & M: Dump Fee (< 6 tons) 1 EA
3013519 - CLASS-1 SERVICE DOCUMENTATION 1 EA
3013854 - SITE EVALUATION NON-ELECTRONIC SEWER LOCATE 1 EA
3013525 - T & M: Three-Person Construction Crew, Straight Time 4 HR
3013546 - T & M: Laborer - straight time 4 HR
Extra Service Items:


THIS ORDER IS: APPROVED