Paysheet #2712

Job Created: 12/20/22
Job Number: VEC22343 Job Name: 104734584
Job Notes: 12-19-22, 513 4th st. Washington courthouse. Saw cut, removed asphalt, 3 hard spot holes for bore, when digging up the 3” plastic main it ended up being steel. After contacting supervision and center point it was determined that the 3” was inserted. Welded a punch tee on for verification and when tapping the tee it popped off. Contacted center point supervision again it was determined to be cast iron. We will be finishing job on another date.
SAP Workorder Number: 104734584
 
Foreman Name:Jason peters
Work Dates: 12/19/22 - 12/19/22
Item - Description Item Qty Item UOM
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 32 FT
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 24 SF
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 3 EA
3013529 - T & M: Welder With Welding Rig - straight time 1 HR
Extra Service Items:


THIS ORDER IS: APPROVED