Paysheet #2747

Job Created: 12/29/22
Job Number: VEC22332 Job Name: 104799165
Job Notes: 2907 New Germany Trebein rd. Established grade install service to house from 4” MPPL, main was 8’ deep, vacd out to spot it and d the 6” HP, didn’t find 6” but found the 4”. Tried to find the telephone, and cable main let it go at 7’ had a 4’x1’x7’ deep hole. Was going to bore, but after the depth on the main I just dug the service in, had shoring boards and jacks for hole the dug trench to house and ran 71’ of 1” and set a 250 meter bar, no meter, had a hard card.
SAP Workorder Number: 104799165
 
Foreman Name:John Greene
Work Dates: 12/28/22 - 12/28/22
Item - Description Item Qty Item UOM
3013180 - 1- 75' SS EG PLASTIC GAS SERVICE - SCATTERED 1 EA
3014620 - Combo Dig/Backfill: Extra depth-bell hole (5-10') 90 SQFT/FT
3013519 - CLASS-1 SERVICE DOCUMENTATION 1 EA
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 2 EA
3013782 - SERVICES: ADDITIONAL COVERAGE SPOT HOLE SOFT SURFACE PER EACH ADDITIONAL FOOT OF DEPTH 12 FT
Extra Service Items:


THIS ORDER IS: APPROVED