Job Created: 02/01/23 |
Job Number: VEC22349 |
Job Name: 105551035 |
Job Notes: Dug from the backside of pole to the CL of Armstrong 53’ total , cut the road to the CL had 30’ of hard surface road cut, had to go under the AT&T to b 28”, only got 26” under road. Beat out everything w a jackhammer and then had to go get a different hoe w a hoe-ram. Got a load of sand w first dump and 2/1/23 will be the second load. |
SAP Workorder Number: 105551035 |
|
|
Foreman Name:John Greene |
Work Dates: 01/31/23 - 01/31/23 |
|