Paysheet #2959

Job Created: 02/02/23
Job Number: VEC22349 Job Name: 105551035
Job Notes: 789 Stoneybrook Trl. Claimed all rock on 1/31/23 had wrong measurements, but finished digging out the remaining trench w same amount of rock, got everything sanded from main to top of hill where rock finished, got 2” pipe in and connected, sand padded everything and flowfilled road, got everything on test including setting. Had 38’ of hard surface removal and saw cut for the road, had 27.51 tons of sand, backfilled, tapped 2” HV tee, locked everything off at the setting after tested, and will finish the clean up on Thursday.
SAP Workorder Number: 105551035
 
Foreman Name:John Greene
Work Dates: 02/01/23 - 02/01/23
Item - Description Item Qty Item UOM
3013185 - 126- 200' LS EG PLASTIC GAS SERVICE - SCATTERED 1 EA
3013407 - Combo Dig/Backfill: Provide & place sand fill 27.51 TON
3013671 - PROVIDE & PLACE FLOWABLE FILL, 3 - 10 CUYD 6 CY
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 76 SF
3013519 - CLASS-1 SERVICE DOCUMENTATION 1 EA
3013417 - Combo: Permits (cost plus 5% markup) 84 EA
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 80 FT
Extra Service Items:


THIS ORDER IS: APPROVED

CLICK HERE TO SEE ANY AVAILABLE ATTACHMENTS