Paysheet #3110

Job Created: 02/23/23
Job Number: CP2309 Job Name: V-848 [N MAIN ST]
Job Notes: Open cut across Waverly Ave and installed new 2” plastic main and wire. CDF flow filled road crossing. Open cut and installed new 4” plastic main and wire on N. Main St. Backfilled ditch line. Cold patched road crossing at Kurtz Ave.
SAP Workorder Number: 98784396 / V848
 
Foreman Name:Anthony Delawder
Work Dates: 02/22/23 - 02/22/23
Item - Description Item Qty Item UOM
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 56 SF
3013673 - Combo Dig/Backfill: Remove sidewalk (including disposal) 156 SF
3013410 - Combo Dig/Backfill: Provide & place flowable fill 4 CY
3013903 - Install 2" - >2000' by trench 50 FT
3013907 - Install 3" & 4" - >2000' by trench 87 FT
3013407 - Combo Dig/Backfill: Provide & place sand fill 66.68 TON
3013408 - Combo Dig/Backfill: Provide & place gravel fill 44.34 TON
3013536 - Combo: Flagman (subcontracted, cost plus 5% markup) 1123.23 EA
Extra Service Items:


THIS ORDER IS: APPROVED

CLICK HERE TO SEE ANY AVAILABLE ATTACHMENTS