Paysheet #3117

Job Created: 02/24/23
Job Number: CP2378 Job Name: 106668860
Job Notes: 443 Center St, crew went out for overnight saw cut road an sidewalk dug up existing 3” main an 1 1/4 service killed old service an ran 16ft of new 1” HDPE line to new 250 meter set. Plumber had to move out meter set, crew did install a new curb valve per Center point along with tied on to existing stub 1” orange from previous tap wasn’t leaking crew soaped everything an replaced coating. Tested gassed up back filled sand and gravel cold patch road. Locked off nobody was home for relight
SAP Workorder Number: 106668860
 
Foreman Name:Tyler H
Work Dates: 02/23/23 - 02/23/23
Item - Description Item Qty Item UOM
3013854 - SITE EVALUATION NON-ELECTRONIC SEWER LOCATE 1 EA
3013407 - Combo Dig/Backfill: Provide & place sand fill 3.23 TON
3013519 - CLASS-1 SERVICE DOCUMENTATION 1 EA
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 22 FT
3013673 - Combo Dig/Backfill: Remove sidewalk (including disposal) 18 SF
3013408 - Combo Dig/Backfill: Provide & place gravel fill 3.36 TON
3013392 - Mtr Mvot: Single Meter Moveout / Relocation w/ up to 3' of Fuel Line Relocation 1 EA
3013442 - RETIRE STEEL SERVICE-SAME HOLE =<2" 1 EA
3013525 - T & M: Three-Person Construction Crew, Straight Time 1 HR
3013180 - 1- 75' SS EG PLASTIC GAS SERVICE - SCATTERED 1 EA
Extra Service Items:


THIS ORDER IS: APPROVED