Paysheet #3135

Job Created: 02/28/23
Job Number: CP2309 Job Name: V-848 [N MAIN ST]
Job Notes: Saw cut and open cut across W. Siebenthaler Ave. Installed 2” plastic pipe and wire. Sand padded road crossing and backfilled trench with CDF flow fill. Plated road crossing. Saw cut and removed sidewalk blocks W. Siebenthaler Ave. for spot holes. Potholed utilities in bore path and plated pot holes.
SAP Workorder Number: 98784396 / V848
 
Foreman Name:Anthony Delawder
Work Dates: 02/27/23 - 02/27/23
Item - Description Item Qty Item UOM
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 220 FT
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 120 SF
3013673 - Combo Dig/Backfill: Remove sidewalk (including disposal) 369 SF
3013410 - Combo Dig/Backfill: Provide & place flowable fill 10 CY
3013903 - Install 2" - >2000' by trench 80 FT
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 8 EA
Extra Service Items:


THIS ORDER IS: APPROVED

CLICK HERE TO SEE ANY AVAILABLE ATTACHMENTS