Paysheet #3144

Job Created: 03/01/23
Job Number: CP2309 Job Name: V-848 [N MAIN ST]
Job Notes: Cold patched ditch across W. Siebenthaler Ave. Open cut the south corner of Main St and W. Siebenthaler Ave. for 2” main install and inline tee. Found large concrete pillar in the only ditch path option, had to spend an hour breaking and removing concrete. Installed 2” 3 way inline tee. Bored in 2” pipe and wire up W. Siebenthaler Ave. Connected bore pipe to inline tee. Backfilled spot holes and bell holes. Cold patched bell holes and spot holes on W. Siebenthaler Ave. Installed HV tee and connected 2” pipe at N. Main St. and Maylan Dr. Blew 2” pigs through new main and installed end of main purge caps at W. Siebenthaler Ave, ForestGlen Ave, Maylan Dr. and Bruce Ave.
SAP Workorder Number: 98784396 / V848
 
Foreman Name:Anthony Delawder
Work Dates: 02/28/23 - 02/28/23
Item - Description Item Qty Item UOM
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 30 SF
3013269 - MAIN: INSTALL 2" - >2000' BY BORE 110 p/ft
3013903 - Install 2" - >2000' by trench 10 FT
3013407 - Combo Dig/Backfill: Provide & place sand fill 45.38 TON
3013408 - Combo Dig/Backfill: Provide & place gravel fill 21.84 TON
3013409 - Combo Dig/Backfill: Provide & place asphalt cold patch 8.61 TON
3013525 - T & M: Three-Person Construction Crew, Straight Time 1 HR
3013532 - Combo: Contractor-Supplied Materials (cost plus 5% markup) 474.08 EA
Extra Service Items:


THIS ORDER IS: APPROVED

CLICK HERE TO SEE ANY AVAILABLE ATTACHMENTS