Job Created: 03/03/23 |
Job Number: CP2367 |
Job Name: 106127032 |
Job Notes: Crew installed 2 verification tees squeezed off 2” yellow two way feed main cut out 3ft an replaced with 3ft of 2” HDPE, crew also tied over existing yellow 1” that was previously retired per center point was told to blow it out an pig it crew blew air for 15 minutes pigged it several times installed new 2x1 tee 700 EFV an 6 ft of new 1” HDPE new 250 meter set tested everything 15 minutes all held tapped purged |
SAP Workorder Number: 106787344 /46 Washington St. |
|
|
Foreman Name:Tyler H |
Work Dates: 03/02/23 - 03/02/23 |
|