Paysheet #3381

Job Created: 03/28/23
Job Number: CP23101 Job Name: 104310453
Job Notes: 705 Highland Ave Horizon put a tower/ building in the back of the golf course and needed gas to that building, dug up 8” MPSTL and welded a punch tee on, w an 1100 EFV, and ran 138’ of 1” HDPE pipe to the inside of this gated building, set a 630 meter setting to be tied into. Was told that there plumber had to tie into generator due to warranty. No meter, no tie in, backfilled, backflagged, purged, and locked off.
SAP Workorder Number: 104310453
 
Foreman Name:John Greene
Work Dates: 03/27/23 - 03/27/23
Item - Description Item Qty Item UOM
3013182 - 126- 200' SS EG PLASTIC GAS SERVICE - SCATTERED 1 EA
3013420 - Svc: Weld Service Tee with transition less than or equal to 2" 1 EA
3013407 - Combo Dig/Backfill: Provide & place sand fill 1.95 TON
3013519 - CLASS-1 SERVICE DOCUMENTATION 1 EA
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 160 SF
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 88 FT
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 5 EA
3013854 - SITE EVALUATION NON-ELECTRONIC SEWER LOCATE 1 EA
Extra Service Items:


THIS ORDER IS: APPROVED