Job Notes: 1695 Wimbledon Dr crew dug up permalock tee 1way feed fused on 2 4x1 verification tees 2 4x1 tees with 1” bypass squeezed off cut out 3ft section of 4” main an replaced installed new 4x1 service tee an 700 efv tested gassed up soaped everything out. Purged backfill cleaned up relight
SAP Workorder Number: 104829439
 
Foreman Name:Tyler Henize
Work Dates: 04/13/23 - 04/13/23
Item - Description Item Qty Item UOM
3013441 - RETIRE PLASTIC SERVICE-SAME HOLE =<2" 1 EA
3013435 - Svc: Service Tie-over, shortside 1 EA
3013854 - SITE EVALUATION NON-ELECTRONIC SEWER LOCATE 1 EA
3013519 - CLASS-1 SERVICE DOCUMENTATION 1 EA
3013417 - Combo: Permits (cost plus 5% markup) 31.5 EA
3013608 - Svc: Relight Customer Appliances 1 EA
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 3 EA
3013459 - 3 & 4" PLASTIC TO PLASTIC TIE-IN (INCLUDING EXCAVATION) 2 EA
3013640 - 3" & 4" PLASTIC MAIN RETIREMENT, SAME HOLE 2 EA
3013440 - Svc: Meter Set Replacement or Conversion 1 EA
3013405 - Main: Install & remove temporary by-pass less than or equal to 2" 1 EA
3013904 - Install 3" & 4" - 1'-300' by trench 3 FT