Paysheet #4490

Job Created: 07/26/23
Job Number: CP2384 Job Name: 99339902
Job Notes: 201 Castlewood Ave. (Moveout Customer Service, No Relight-Vacant)
SAP Workorder Number: 106956324 / V1129
 
Foreman Name:Brad Schuler
Work Dates: 07/25/23 - 07/25/23
Item - Description Item Qty Item UOM
3013257 - Svc: 1-75' long side - with main 1 EA
3013445 - RETIRE STEEL SERVICE-SEPARATE HOLE =<2" 1 EA
3013392 - Mtr Mvot: Single Meter Moveout / Relocation w/ up to 3' of Fuel Line Relocation 1 EA
3013389 - Fuel Line: Customer Fuel Line greater than 3 feet, less than or equal to 2" 2 FT
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 3 EA
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 1 EA
3013673 - Combo Dig/Backfill: Remove sidewalk (including disposal) 18 SF
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 6 FT
Extra Service Items:


THIS ORDER IS: APPROVED