Paysheet #4516

Job Created: 07/28/23
Job Number: CP2384 Job Name: 99339902
Job Notes: 225 Castlewood Ave. (Moveout Customer Service)
SAP Workorder Number: 106956525 / V1129
 
Foreman Name:Brad Schuler
Work Dates: 07/27/23 - 07/27/23
Item - Description Item Qty Item UOM
3013257 - Svc: 1-75' long side - with main 1 EA
3013445 - RETIRE STEEL SERVICE-SEPARATE HOLE =<2" 1 EA
3013608 - Svc: Relight Customer Appliances 1 EA
3013392 - Mtr Mvot: Single Meter Moveout / Relocation w/ up to 3' of Fuel Line Relocation 1 EA
3013389 - Fuel Line: Customer Fuel Line greater than 3 feet, less than or equal to 2" 4 FT
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 4 EA
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 4 SF
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 8 FT
Extra Service Items:


THIS ORDER IS: APPROVED