Paysheet #4603

Job Created: 08/09/23
Job Number: CP23224 Job Name: 2023 CP MODERNIZATION
Job Notes: Bored in 4” plastic main on Philadelphia Dr. Open cut and installed 4” plastic main on Philadelphia Dr. Potholed utilities in bore paths on Burgess Ave. saw cut and removed concrete.
SAP Workorder Number: 100116215 / V-X -1064
 
Foreman Name:Anthony Delawder
Work Dates: 08/08/23 - 08/08/23
Item - Description Item Qty Item UOM
3013273 - MAIN: INSTALL 3"&4"- >2000' BY BORE 640 FT
3013907 - Install 3" & 4" - >2000' by trench 5 FT
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 15 FT
3013673 - Combo Dig/Backfill: Remove sidewalk (including disposal) 50 SF
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 19 EA
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 2 EA
Extra Service Items:


THIS ORDER IS: APPROVED