Paysheet #4776

Job Created: 08/29/23
Job Number: CP23147 Job Name: V-2403 99383340
Job Notes: 4001 Daleview Ave dug up main in concrete then had 4 spot holes 2 hard service, 2 soft service, to bore service across road, trenched from end of bore to house due to utp, moved meter out, retired steel service separate hole, had 15’ of steel pipe inside, ran 78’ of 1” HDPE to house set riser, meter loop, and new meter, tested house line, and service line, and no relight customer told me to shut appliances off at the valve, cleaned up and backfilled.
SAP Workorder Number: 107071300 / V2403
 
Foreman Name:John Greene
Work Dates: 08/28/23 - 08/28/23
Item - Description Item Qty Item UOM
3013258 - Svc: 76-125' long side - with main 1 EA
3013389 - Fuel Line: Customer Fuel Line greater than 3 feet, less than or equal to 2" 13 FT
3013392 - Mtr Mvot: Single Meter Moveout / Relocation w/ up to 3' of Fuel Line Relocation 1 EA
3013445 - RETIRE STEEL SERVICE-SEPARATE HOLE =<2" 1 EA
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 2 EA
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 2 EA
3013604 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 7" - 12" 16 FT
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 8 SF
Extra Service Items:


THIS ORDER IS: APPROVED