Paysheet #4817

Job Created: 08/31/23
Job Number: CP23147 Job Name: V-2403 99383340
Job Notes: 4115 Daleview Ave. (Moveout Customer Service) (No Relight, Locked-Off, Leaks)
SAP Workorder Number: 107071308 / V2403
 
Foreman Name:Brad Schuler
Work Dates: 08/30/23 - 08/30/23
Item - Description Item Qty Item UOM
3013258 - Svc: 76-125' long side - with main 1 EA
3013444 - RETIRE PLASTIC SERVICE-SEPARATE HOLE =<2" 1 EA
3013392 - Mtr Mvot: Single Meter Moveout / Relocation w/ up to 3' of Fuel Line Relocation 1 EA
3013389 - Fuel Line: Customer Fuel Line greater than 3 feet, less than or equal to 2" 3 FT
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 3 EA
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 1 EA
3014620 - Combo Dig/Backfill: Extra depth-bell hole (5-10') 12 SQFT/FT
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 18 SF
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 16 FT
Extra Service Items:


THIS ORDER IS: APPROVED