Paysheet #5032

Job Created: 09/29/23
Job Number: CP23224 Job Name: 2023 CP MODERNIZATION
Job Notes: 5568 Joyceann Dr. / Dug up 2” HDPE main, and bored in 60’ of 1” HDPE to the house and set new riser, meter loop, and meter outside, moved old meter out, and tied in at the house wall, tested house line, and service line. Retired 1 1/4” steel service in rear, and backfilled.
SAP Workorder Number: 108162940 / V-X-1064
 
Foreman Name:John Greene
Work Dates: 09/28/23 - 09/28/23
Item - Description Item Qty Item UOM
3013254 - Svc: 1-75 ft short side - with main 1 EA
3013389 - Fuel Line: Customer Fuel Line greater than 3 feet, less than or equal to 2" 30 FT
3013392 - Mtr Mvot: Single Meter Moveout / Relocation w/ up to 3' of Fuel Line Relocation 1 EA
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 1 EA
3013445 - RETIRE STEEL SERVICE-SEPARATE HOLE =<2" 1 EA
3013608 - Svc: Relight Customer Appliances 1 EA
Extra Service Items:


THIS ORDER IS: APPROVED