Paysheet #5078

Job Created: 10/05/23
Job Number: CP23224 Job Name: 2023 CP MODERNIZATION
Job Notes: Saw cut and removed asphalt and concrete on Cedarlawn Drive for potholes. Potholed utilities in bore paths on Cedarlawn Drive. Open cut and installed new 2” plastic pipe and wire on N. Main St. Bored in new 2” plastic pipe and wire on Cedarlawn Drive.
SAP Workorder Number: 100116215 / V-X -1064
 
Foreman Name:Anthony Delawder
Work Dates: 10/04/23 - 10/04/23
Item - Description Item Qty Item UOM
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 44 FT
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 16 SF
3013673 - Combo Dig/Backfill: Remove sidewalk (including disposal) 75 SF
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 15 EA
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 1 EA
3013903 - Install 2" - >2000' by trench 28 FT
3013269 - MAIN: INSTALL 2" - >2000' BY BORE 448 p/ft
Extra Service Items:


THIS ORDER IS: APPROVED