Job Created: 10/17/23
Job Number: CP23224 Job Name: 2023 CP MODERNIZATION
Job Notes: Saw cut and removed asphalt on Philadelphia Dr. for potholes. Potholed utilities in bore paths on Philadelphia Drive. Shut down lane of traffic on Philadelphia Dr. Bored in 2” and 4” HDPE pipe on Philadelphia Drive for Regulator setting. Open cut and installed 2” HDPE pipe and wire. Installed new regulator setting n the ditch and fused to 2” and 4” HDPE pipe and wire. Welded on 4” Williamson tee and 2” short stop on existing 4”;steel main.
SAP Workorder Number: 100116215 / V-X -1064
 
Foreman Name:Anthony Delawder
Work Dates: 10/16/23 - 10/16/23
Item - Description Item Qty Item UOM
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 10 FT
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 36 SF
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 2 EA
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 2 EA
3013269 - MAIN: INSTALL 2" - >2000' BY BORE 75 p/ft
3013273 - MAIN: INSTALL 3"&4"- >2000' BY BORE 80 FT
3013903 - Install 2" - >2000' by trench 10 FT
3013605 - Combo: Flagman 21 HR
Extra Service Items:


THIS ORDER IS: APPROVED