Job Number: CP23224 Job Name: 2023 CP MODERNIZATION
Job Notes: (Muliple days for T/E 10/18 and 10/19 ) Squeezed off existing low pressure HDPE plastic main on Meadowbrook Ave. Disconnected low pressure feed on both sides of the creek. Blew 4” pigs through 4” plastic pipe and fused on purge caps. Renewed services at 90&91 Meadowbrook Ave. Tested 4” plastic main and services. Removed passed test and tied existing 4” plastic main into new 2” HDPE medium pressure main on both sides of the creek.
SAP Workorder Number: 100116215 / V-X -1064
 
Foreman Name:Anthony Delawder
Work Dates: 10/19/23 - 10/19/23
Item - Description Item Qty Item UOM
3013525 - T & M: Three-Person Construction Crew, Straight Time 20 HR
3013409 - Combo Dig/Backfill: Provide & place asphalt cold patch 7.94 TON