Job Created: 10/23/23 |
Job Number: CP23224 |
Job Name: 2023 CP MODERNIZATION |
Job Notes: (Muliple days for T/E 10/18 and 10/19 ) Squeezed off existing low pressure HDPE plastic main on Meadowbrook Ave. Disconnected low pressure feed on both sides of the creek. Blew 4” pigs through 4” plastic pipe and fused on purge caps. Renewed services at 90&91 Meadowbrook Ave. Tested 4” plastic main and services. Removed passed test and tied existing 4” plastic main into new 2” HDPE medium pressure main on both sides of the creek. |
SAP Workorder Number: 100116215 / V-X -1064 |
|
|
Foreman Name:Anthony Delawder |
Work Dates: 10/19/23 - 10/19/23 |
|