Paysheet #5270

Job Created: 10/31/23
Job Number: CP23224 Job Name: 2023 CP MODERNIZATION
Job Notes: 124 Elm Hill/ dug up 2” main, bored road crossing only, had 2 soft surface holes and one hard surface hole 2’x2’, open cut 36’, and bored 32’. People that lined there worked till 5pm so couldn’t move meter out till then, moved meter out and set new riser, meter loop, and meter, tied in to house line and tested house line and service line, relight on appliances, backfilled and cleaned up site.
SAP Workorder Number: 108161876 / V-X-1064
 
Foreman Name:John Greene
Work Dates: 10/30/23 - 10/30/23
Item - Description Item Qty Item UOM
3013257 - Svc: 1-75' long side - with main 1 EA
3013389 - Fuel Line: Customer Fuel Line greater than 3 feet, less than or equal to 2" 2 FT
3013392 - Mtr Mvot: Single Meter Moveout / Relocation w/ up to 3' of Fuel Line Relocation 1 EA
3013444 - RETIRE PLASTIC SERVICE-SEPARATE HOLE =<2" 1 EA
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 4 SF
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 8 FT
3013608 - Svc: Relight Customer Appliances 1 EA
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 2 EA
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 1 EA
Extra Service Items:


THIS ORDER IS: APPROVED