Paysheet #5340

Job Created: 11/07/23
Job Number: CP23224 Job Name: 2023 CP MODERNIZATION
Job Notes: 20 Elm Hill/ spotted both main in soft surface, and water in hard surface (2’x2’) bored road crossing retired steel service then dug up where they bored and hole hogged to a separate hole then from there to the house had 88’ of 1”. Moved meter outside, set new riser, meter loop, and meter, tied together, tested house line, and service line, relight on appliances, backfilled, and cleaned up.
SAP Workorder Number: 108161620 / V-X-1064
 
Foreman Name:John Greene
Work Dates: 11/06/23 - 11/06/23
Item - Description Item Qty Item UOM
3013258 - Svc: 76-125' long side - with main 1 EA
3013389 - Fuel Line: Customer Fuel Line greater than 3 feet, less than or equal to 2" 3 FT
3013392 - Mtr Mvot: Single Meter Moveout / Relocation w/ up to 3' of Fuel Line Relocation 1 EA
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 4 SF
3013445 - RETIRE STEEL SERVICE-SEPARATE HOLE =<2" 1 EA
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 8 FT
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 2 EA
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 1 EA
3013608 - Svc: Relight Customer Appliances 1 EA
Extra Service Items:


THIS ORDER IS: APPROVED