Paysheet #5354

Job Created: 11/08/23
Job Number: CP23224 Job Name: 2023 CP MODERNIZATION
Job Notes: 64 Elm Hill/ spotted new and old main in soft surface, and water in hard surface (2’x2’). Bored 41’ of 1” to cross road and tied on to 39’ of 1/2” MDPE, setting was new perfection, meter loop was new, changed meter, tested house line and locked off due to customer wasn’t going to be home till 9pm, no relight, tested service line and retired old plastic in same hole. Backfilled and cleaned up, and backfilled hole in road.
SAP Workorder Number: 108161744 / V-X-1064
 
Foreman Name:John Greene
Work Dates: 11/07/23 - 11/07/23
Item - Description Item Qty Item UOM
3013258 - Svc: 76-125' long side - with main 1 EA
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 1 EA
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 2 EA
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 4 SF
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 8 FT
Extra Service Items:


THIS ORDER IS: APPROVED