Paysheet #5394

Job Created: 11/14/23
Job Number: CP23224 Job Name: 2023 CP MODERNIZATION
Job Notes: 54 Elm Hill/ spotted new and old main in soft surface, water in hard surface(2’x2’) dug up 4” main bored road only (40’) tie over was 44’, retired plastic in same hole, tested house line and service line to house, service was 84’ total, guy was late getting home Cole had to stay behind and relight, backfilled everything, and cleaned up.
SAP Workorder Number: 108161738 / V-X-1064
 
Foreman Name:John Greene
Work Dates: 11/13/23 - 11/13/23
Item - Description Item Qty Item UOM
3013258 - Svc: 76-125' long side - with main 1 EA
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 4 SF
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 2 EA
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 1 EA
3013608 - Svc: Relight Customer Appliances 1 EA
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 8 FT
Extra Service Items:


THIS ORDER IS: APPROVED