Paysheet #5487

Job Created: 11/29/23
Job Number: CP23224 Job Name: 2023 CP MODERNIZATION
Job Notes: 225 Elm Hill Dr. / Dug up 4” HDPE main, trenched in 60’ of 1” HDPE, set new riser, meter loop, and meter, tired old steel service in separate hole, moved old meter outside, when spotted they couldn’t see there was a false wall of over 5’ so had to go threw house with 20’ of pipe and come outside w an additional 17’ to tie into meter setting, customer wouldn’t let us in to spot old service so when finally got it scheduled we saw all the problems, tied into setting tested house line and service line and relight on appliances.
SAP Workorder Number: 108162227 / V-X-1064
 
Foreman Name:John Greene
Work Dates: 11/28/23 - 11/28/23
Item - Description Item Qty Item UOM
3013254 - Svc: 1-75 ft short side - with main 1 EA
3013389 - Fuel Line: Customer Fuel Line greater than 3 feet, less than or equal to 2" 37 FT
3013392 - Mtr Mvot: Single Meter Moveout / Relocation w/ up to 3' of Fuel Line Relocation 1 EA
3013445 - RETIRE STEEL SERVICE-SEPARATE HOLE =<2" 1 EA
3013608 - Svc: Relight Customer Appliances 1 EA
3013532 - Combo: Contractor-Supplied Materials (cost plus 5% markup) 39.46 EA
Extra Service Items:


THIS ORDER IS: APPROVED

CLICK HERE TO SEE ANY AVAILABLE ATTACHMENTS