Paysheet #5502

Job Created: 11/30/23
Job Number: CP23224 Job Name: 2023 CP MODERNIZATION
Job Notes: 6020 N. Main St. Dug up 2” HDPE main, dug up and retired steel in the same hole, and inserted 33’ of 1” to the house, set new riser, meter loop, and meter, moved old meter out from basement, had 7’ of house line and claiming parts bought for fixing a leak, relight on everything after fixed, backfilled, and cleaned up.
SAP Workorder Number: 108163325 / V-X-1064
 
Foreman Name:John Greene
Work Dates: 11/29/23 - 11/29/23
Item - Description Item Qty Item UOM
3013254 - Svc: 1-75 ft short side - with main 1 EA
3013389 - Fuel Line: Customer Fuel Line greater than 3 feet, less than or equal to 2" 6 FT
3013392 - Mtr Mvot: Single Meter Moveout / Relocation w/ up to 3' of Fuel Line Relocation 1 EA
3013442 - RETIRE STEEL SERVICE-SAME HOLE =<2" 1 EA
3013608 - Svc: Relight Customer Appliances 1 EA
Extra Service Items:


THIS ORDER IS: APPROVED