|
|
|||||||||||||||||||||||||||||||
| Item - Description | Item Qty | Item UOM | |
|---|---|---|---|
| 3013452 - Svc: Install Additional Meter (In-line & Looped) | 4 | EA | |
| 3013508 - Svc: Install In-line Two-Bar Meter Set | 1 | EA | |
| 3013532 - Combo: Contractor-Supplied Materials (cost plus 5% markup) | 643.59 | EA | |
| Extra Service Items: | |||