Paysheet #6618

Job Created: 04/19/24
Job Number: CP2412 Job Name: DAYTON V-2056 PKG 58-99367932
Job Notes: Long side tie over at 1684 Earlham Drive. Open cut and added 11’ of 2” Hdpe pipe. Retired existing 4” low pressure gas service. Rebuilt 2” 3m rotary meter setting and added a B34 regulator. No relight due to pastor not being available, he will call Centerpoint for relight. Did not replace 3M meter. Gassed up service, left off at meter. Backfilled ditch and bell holes.
SAP Workorder Number: 110715368 / V-2056
 
Foreman Name:Anthony Delawder
Work Dates: 04/18/24 - 04/18/24
Item - Description Item Qty Item UOM
3013436 - Svc: Service Tie-over, longside 1 EA
3013437 - Svc: Service Tie-over, additional plastic service pipe 11 FT
3013440 - Svc: Meter Set Replacement or Conversion 1 EA
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 32 FT
3013673 - Combo Dig/Backfill: Remove sidewalk (including disposal) 25 SF
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 28 SF
3013532 - Combo: Contractor-Supplied Materials (cost plus 5% markup) 342.47 EA
3013289 - Main Ret: Plastic main retirement separate hole 1 EA
Extra Service Items:


THIS ORDER IS: APPROVED

CLICK HERE TO SEE ANY AVAILABLE ATTACHMENTS