|
Item - Description |
Item Qty |
Item UOM |
3013436 - Svc: Service Tie-over, longside |
1 |
EA |
3013437 - Svc: Service Tie-over, additional plastic service pipe |
11 |
FT |
3013440 - Svc: Meter Set Replacement or Conversion |
1 |
EA |
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" |
32 |
FT |
3013673 - Combo Dig/Backfill: Remove sidewalk (including disposal) |
25 |
SF |
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) |
28 |
SF |
3013532 - Combo: Contractor-Supplied Materials (cost plus 5% markup) |
342.47 |
EA |
3013289 - Main Ret: Plastic main retirement separate hole |
1 |
EA |
Extra Service Items: |
|
|