Job Number: CP2447 Job Name: CP2447 - 103771118 - PKG 83 - V-X-6017
Job Notes: Tapped 2” steel tee on 4” steel main on S. Orange St. and Trumbull St. Installed wires on 4” steel main for test station. Greased and wrapped up all bare steel pipe and fittings. Cdf flow filled bell hole in the road and plated off bell hole. Saw cut hard surfaces and removed for 4” pipe installation on W. 2nd St. Started fusing 4” pipe on W. Second St.
SAP Workorder Number: 103771118 / V-X-6017
 
Foreman Name:Anthony Delawder
Work Dates: 10/28/24 - 10/28/24
Item - Description Item Qty Item UOM
3013409 - Combo Dig/Backfill: Provide & place asphalt cold patch 7.16 TON
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 38 FT
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 26 SF
3013283 - Main: 2" plastic to plastic tie-in, with tap 1 EA
3013410 - Combo Dig/Backfill: Provide & place flowable fill 4 CY
Extra Service Items: