Job Created: 10/31/24 |
Job Number: CP24406 |
Job Name: BLANKET-109723331 TIMBER GLEN |
Job Notes: Timber Glen Phase 6 , Wilmington - joint trench : opened up the last of the trench for 2” pipe and opened up the crossings for the 2” put in 500’ of 2” and 75’ of 4”. Started and finished backfilling the south side of Red Maple and the North side as well, then started on the East side of Blue Spruce got over 600’ of that backfilled also, got the West side padded and the most of the North end backfilled. |
SAP Workorder Number: 109723331 |
|
|
Foreman Name:John Greene |
Work Dates: 10/30/24 - 10/30/24 |
|