Paysheet #8351

Job Created: 11/11/24
Job Number: CP2447 Job Name: CP2447 - 103771118 - PKG 83 - V-X-6017
Job Notes: Setup traffic control. Saw cut and removed hard surfaces on W. 2nd St. for 4” pipe installation. Potholed utilities in bore paths on W. 2nd St. Bored in 2” hdpe pipe and wire on Little Main St. Backfilled spot holes on Little Main St. Fused in 4” elbow connecting bore loops on W. 2nd St. Backfilled bell hole. Tore down traffic control with flaggers.
SAP Workorder Number: 103771118 / V-X-6017
 
Foreman Name:Anthony Delawder
Work Dates: 11/08/24 - 11/08/24
Item - Description Item Qty Item UOM
3013269 - MAIN: INSTALL 2" - >2000' BY BORE 305 p/ft
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 58 FT
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 8 SF
3013673 - Combo Dig/Backfill: Remove sidewalk (including disposal) 125 SF
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 4 EA
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 10 EA
3013605 - Combo: Flagman 16 HR
3013582 - T & M: Pick-up truck 8 HR
Extra Service Items:


THIS ORDER IS: APPROVED