Paysheet #8581

Job Created: 12/10/24
Job Number: CP2447- Job Name: V-X-6017 - PKG 83 - 103771118
Job Notes: Setup traffic control on W. 2nd St on both sides of the road. Dug up 3” steel low pressure gas main on the south side of the road. Steel main crosses the road and feeds the service at 850 W. 2nd St. Setup 3” saddle and tapped 3” steel main, bagged off and retired steel main and low pressure gas service. Cut out section of steel and installed 3” dead end bolt dresser. Removed bag from main and installed plug in the steel saddle. Used the retired 3” steel main and inserted new 98’ long side gas service at 850 W. 2nd st. Gas meter already outside. Retired old steel service. Tested and gassed up new service. Relit customer appliances. Backfilled all bell holes and ditch.
SAP Workorder Number: 114108657 / V-X-6017
 
Foreman Name:Anthony Delawder
Work Dates: 12/09/24 - 12/09/24
Item - Description Item Qty Item UOM
3013258 - Svc: 76-125' long side - with main 1 EA
3013445 - RETIRE STEEL SERVICE-SEPARATE HOLE =<2" 1 EA
3013608 - Svc: Relight Customer Appliances 1 EA
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 12 FT
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 8 SF
3013605 - Combo: Flagman 16 HR
3013532 - Combo: Contractor-Supplied Materials (cost plus 5% markup) 40.31 EA
3013582 - T & M: Pick-up truck 8 HR
3015722 - Install/Retire Single Meter Set 1 EA
Extra Service Items:


THIS ORDER IS: APPROVED

CLICK HERE TO SEE ANY AVAILABLE ATTACHMENTS