Paysheet #8922

Job Created: 02/14/25
Job Number: CP2501 Job Name: V-1950 PKG 54 - 102059040
Job Notes: Saw cut and removed hard surfaces. Done a long side tie-over at 522 Steele Ave. meter already outside. Added 31’ of 1” hdpe service pipe and wire. Replaced riser and meter setting. Retired existing low pressure service. No relight, left door tag. No one home for relight. Backfilled bell holes.
SAP Workorder Number: 115508456 / V-1950
 
Foreman Name:Anthony Delawder
Work Dates: 02/13/25 - 02/13/25
Item - Description Item Qty Item UOM
3013436 - Svc: Service Tie-over, longside 1 EA
3013437 - Svc: Service Tie-over, additional plastic service pipe 31 FT
3013439 - Svc: Service Riser Replacement 1 EA
3013440 - Svc: Meter Set Replacement or Conversion 1 EA
3015722 - Install/Retire Single Meter Set 1 EA
3013444 - RETIRE PLASTIC SERVICE-SEPARATE HOLE =<2" 1 EA
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 72 FT
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 40 SF
3013673 - Combo Dig/Backfill: Remove sidewalk (including disposal) 56 SF
Extra Service Items:


THIS ORDER IS: APPROVED