Paysheet #926

Job Created: 04/29/22
Job Number: VEC2201 Job Name: V-1943
Job Notes: Saw cut and finished open cut across Burkhardt Ave. Installed new 2” main across the road. Sand padded the pipe and backfilled the road crossing with cdf flow fill. Plated the road. Dug up existing 6” main on Burkhardt Ave and installed 6” high volume tee. Fused in set of bends and 2” valve in the sidewalk. Put the new main on test. Removed test and tapped the high volume tee and gassed up new 2” main up to the valve. Cold patched the steel plates.
SAP Workorder Number: 98789867
 
Foreman Name:Anthony Delawder
Work Dates: 04/28/22 - 04/28/22
Item - Description Item Qty Item UOM
3013904 - Install 3" & 4" - 1'-300' by trench 52 FT
3013283 - Main: 2" plastic to plastic tie-in, with tap 1 EA
3013603 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 6" 32 FT
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 32 SF
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 1 EA
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 3 EA
3013410 - Combo Dig/Backfill: Provide & place flowable fill 5 CY
Extra Service Items:


THIS ORDER IS: APPROVED

CLICK HERE TO SEE ANY AVAILABLE ATTACHMENTS