Paysheet #962

Job Created: 05/04/22
Job Number: VEC2228 Job Name: 99816298
Job Notes: 5-3-22, PID 112372 olentangy dr. Riverside, vac truck 8 am to 12 pm, saw cut, removed asphalt, pot holed for bore, 7 soft and 3 hard. Picked up materials and pipe for job.
SAP Workorder Number: 99816298
 
Foreman Name:Jason Peters
Work Dates: 05/03/22 - 05/03/22
Item - Description Item Qty Item UOM
3013602 - Combo Dig/Backfill: Saw Cut Hard Surface Prior to Removal less than or equal to 13" - 18" 16 FT
3013412 - Combo Dig/Backfill: Remove roadway (parking lot, street, driveway) (including disposal) 8 SF
3013416 - Combo Dig/Backfill: Spot Holes - soft surface (to ensure separation of facilities during boring activities) 7 EA
3013418 - Combo Dig/Backfill: Spot Holes - hard surface (to ensure separation of facilities during boring activities) 3 EA
Extra Service Items:


THIS ORDER IS: APPROVED